Traffic Management

This page has been archived. Please visit the new managing the impact of construction page to see the latest news and information.

HS2 recognise that traffic and transport management during construction is a key issue for local communities along the line of route. In particular, construction will lead to many more vehicles on the road network and to short-term and long-term changes to the road network.

HS2 have made many commitments to minimise impacts where practicable to do so and has prepared a Route-wide Traffic Management Plan . This plan sets out how contractors will be expected to deliver the project. It covers how contractors are to plan traffic and transport during construction, managing construction flows, vehicle and driver safety, workforce travel plans, temporary traffic management and how the project needs to protect highways and other assets.

Contractors are required to prepare local traffic management plans, setting out their local strategies for managing traffic and to set out their proposed lorry routes and forecast traffic flows. These plans will be consulted on through local traffic liaison meetings which have been established along the HS2 Phase One route and include highway authorities, emergency services and other key stakeholders such as public transport representatives. These meetings will enable review of site specific traffic management measures as they are developed by HS2’s contractors.

If you have any questions or comments please contact HS2enquiries@hs2.org.uk or call 08081 434 434 and refer to "HS2 in Warwickshire".

Additional materials

Notification of  Cadent pipeline diversion works in Coleshill
Notification of Cadent pipeline diversion works in Coleshill
pdf
Early Works notification -temporary lane closure along Marston Lane
Early Works notification -temporary lane closure along Marston Lane
pdf
Early Works notification  temporary lane closure along Warwick Bypass (A46)
Early Works notification temporary lane closure along Warwick Bypass (A46)
pdf
Early Works temporary lane closure along Long Itchington Road
Early Works temporary lane closure along Long Itchington Road
pdf
Early Works temporary lane closure along Lichfield Road near Watton Lane
Early Works temporary lane closure along Lichfield Road near Watton Lane
pdf
Early Works - Phase 2 temporary road closures, near Harbury
Early Works - Phase 2 temporary road closures, near Harbury
pdf
Early Works- Phase 3 utilities works near Long Itchington Wood tunnel
Early Works- Phase 3 utilities works near Long Itchington Wood tunnel
pdf
Traffic Lights on Long Itchington Road in Offchurch
Traffic Lights on Long Itchington Road in Offchurch
pdf
UPDATED: Early Works- Phase 3 utilities works near Long Itchington Wood tunnel
UPDATED: Early Works- Phase 3 utilities works near Long Itchington Wood tunnel
pdf
Vegetation clearance near Stoneleigh Park
Vegetation clearance near Stoneleigh Park
pdf
Long Itchington Wood tunnel- Phase 4 utilities work
Long Itchington Wood tunnel- Phase 4 utilities work
pdf
Ashow Road, temporary traffic management
Ashow Road, temporary traffic management
pdf